This sunday I sweated a lot !! taking my 13 Uni-Solar Panels from the basement all the up to the 5th floor ... no elevator here, so 6 stories up and down
I was preparing for their installation on the building zinc roof the next day
After weeks of cold and bad weather, when I saw the sunny forecast of the next week, I insisted that my contrator comes to install themn, and saturday he talk to him on the phone and he said he could come monday ...
I was preparing for their installation on the building zinc roof the next day
After weeks of cold and bad weather, when I saw the sunny forecast of the next week, I insisted that my contrator comes to install themn, and saturday he talk to him on the phone and he said he could come monday ...
No comments:
Post a Comment